{"id":9693,"date":"2020-06-01T09:28:48","date_gmt":"2020-06-01T07:28:48","guid":{"rendered":"https:\/\/www.neva.eu\/uncategorized\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/"},"modified":"2020-07-10T07:02:50","modified_gmt":"2020-07-10T05:02:50","slug":"neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra","status":"publish","type":"post","link":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/","title":{"rendered":"NEVA builds: watch the first steps of training centre construction."},"content":{"rendered":"<p>In April, we launched construction of the administrative building in which we plan on having a training room, a new cafeteria for employees, a representative showroom and new offices. The building is to be connected with the exterior rest zone, and other buildings in the complex will be connected via exterior corridors.<\/p>\n<h2>What archaeologists found while digging the foundation<\/h2>\n<p>Excavation work for all our construction projects traditionally involves archaeological research, which is necessary due to the <strong>dense settlement of the so-called \u201cKralice grove\u201d<\/strong>, i.e., the present industrial zone at Prost\u011bjov. This time, archaeologists found fragments of pottery from the Linear Pottery culture, Painted Moravian Ware and the Plat\u011bnice culture. They even uncovered foundations of simple buildings from the original medieval village of Rakousky.<\/p>\n<div style=\"width: 930px;\" class=\"wp-video\"><video class=\"wp-video-shortcode\" id=\"video-9693-1\" width=\"930\" height=\"523\" poster=\"https:\/\/www.neva.eu\/wp-content\/uploads\/ftp-timing-snap-20200504111429-34-scaled.jpg\" preload=\"metadata\" controls=\"controls\"><source type=\"video\/mp4\" src=\"https:\/\/www.neva.eu\/wp-content\/uploads\/casosber-budova-vystup.mp4?_=1\" \/><source type=\"video\/webm\" src=\"https:\/\/www.neva.eu\/wp-content\/uploads\/casosber-budova-vystup.webm?_=1\" \/><a href=\"https:\/\/www.neva.eu\/wp-content\/uploads\/casosber-budova-vystup.mp4\">https:\/\/www.neva.eu\/wp-content\/uploads\/casosber-budova-vystup.mp4<\/a><\/video><\/div>\n<div style=\"font-style: italic; color: #999; font-size: .8125em; margin-bottom: 25px; display: block;\">The construction of the training centre was submitted to the company <a href=\"https:\/\/eproxima.cz\/\">E.PROXIMA<\/a> based in Olomouc. So far, the construction has gone through the phases of basic excavation, archaeological research and final surface preparation.<\/div>\n<h2>We have been consulting the interior with the architect.<\/h2>\n<p>In addition to visible terrain work, we have been consulting the furnishings and final appearance of the rooms with the architect. We have been discussing the furnishings of the training room and the showroom or <strong>furniture selection<\/strong>, such as chairs for the cafeteria or benches for the rest zone.<\/p>\n<h2>What we didn\u2019t expect during construction<\/h2>\n<p>Each NEVA construction project involves certain minor difficulties. When digging for the training centre building, the construction company <strong>hit a high-voltage cable<\/strong>. By cutting through the cable, we cut the power supply for neighbouring NAVOS Farm Technic and the internet connection for our company. However, we handled the outage quickly thanks to a back-up power supply and fixed the other issues within a few hours. Thanks to the quick solution, that situation became more of an amusing story.<\/p>\n<p>Additionally, we have also been finalizing another manufacturing hall to be built over the course of the coming months next to the paint shop.<\/p>\n<p>Follow further news on our site, we will soon present the entire progression of events and work on the training centre in a time-lapse video.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction of our new training centre is in full swing. The first steps involve basic construction modifications of the terrain and archaeological research. Check out what discoveries archaeologists made this time and how the work is proceeding.<\/p>\n","protected":false},"author":4,"featured_media":8679,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"advgb_blocks_editor_width":"","advgb_blocks_columns_visual_guide":"","_daim_seo_power":"","_daim_enable_ail":"","footnotes":""},"categories":[125],"tags":[],"class_list":["post-9693","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-from-the-life-of-neva"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"The construction of the training centre is proceeding according to the plan. We have uncovered some important archaeological finds during the excavation work. You can read below how the first construction works went.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Miloslav Matou\u0161ek\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.1\" \/>\n\n\t\t<meta name=\"facebook-domain-verification\" content=\"l52s6ngz14wm1hk29qnhhp9zt0uj98\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"\u017daluzie NEVA | Kvalita, kterou pozn\u00e1te i po desetilet\u00edch\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"The construction of the training centre is going according to the plan. | NEVA\" \/>\n\t\t<meta property=\"og:description\" content=\"The construction of the training centre is proceeding according to the plan. We have uncovered some important archaeological finds during the excavation work. You can read below how the first construction works went.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.neva.eu\/wp-content\/uploads\/neva-nove-skolici-centrum.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.neva.eu\/wp-content\/uploads\/neva-nove-skolici-centrum.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t\t<meta property=\"og:image:height\" content=\"960\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2020-06-01T07:28:48+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2020-07-10T05:02:50+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/neva.eu\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"The construction of the training centre is going according to the plan. | NEVA\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The construction of the training centre is proceeding according to the plan. We have uncovered some important archaeological finds during the excavation work. You can read below how the first construction works went.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.neva.eu\/wp-content\/uploads\/neva-nove-skolici-centrum.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/from-the-life-of-neva\\\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\\\/#article\",\"name\":\"The construction of the training centre is going according to the plan. | NEVA\",\"headline\":\"NEVA builds: watch the first steps of training centre construction.\",\"author\":{\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/author\\\/matousek\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.neva.eu\\\/wp-content\\\/uploads\\\/neva-nove-skolici-centrum.jpg\",\"width\":1920,\"height\":960},\"datePublished\":\"2020-06-01T09:28:48+02:00\",\"dateModified\":\"2020-07-10T07:02:50+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/from-the-life-of-neva\\\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/from-the-life-of-neva\\\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\\\/#webpage\"},\"articleSection\":\"From the life of NEVA, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/from-the-life-of-neva\\\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/news\\\/category\\\/from-the-life-of-neva\\\/#listItem\",\"name\":\"From the life of NEVA\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/news\\\/category\\\/from-the-life-of-neva\\\/#listItem\",\"position\":2,\"name\":\"From the life of NEVA\",\"item\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/news\\\/category\\\/from-the-life-of-neva\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/from-the-life-of-neva\\\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\\\/#listItem\",\"name\":\"NEVA builds: watch the first steps of training centre construction.\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/from-the-life-of-neva\\\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\\\/#listItem\",\"position\":3,\"name\":\"NEVA builds: watch the first steps of training centre construction.\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/news\\\/category\\\/from-the-life-of-neva\\\/#listItem\",\"name\":\"From the life of NEVA\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/#organization\",\"name\":\"NEVA\",\"description\":\"Kvalita, kterou pozn\\u00e1te i po desetilet\\u00edch\",\"url\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/\",\"telephone\":\"+420588003550\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.neva.eu\\\/wp-content\\\/uploads\\\/NEVA_logo_RGB.png\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/from-the-life-of-neva\\\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\\\/#organizationLogo\",\"width\":135,\"height\":23},\"image\":{\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/from-the-life-of-neva\\\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.instagram.com\\\/neva.eu\\\/\",\"https:\\\/\\\/www.youtube.com\\\/neva-eu\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/neva-eu\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/author\\\/matousek\\\/#author\",\"url\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/author\\\/matousek\\\/\",\"name\":\"Miloslav Matou\\u0161ek\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/from-the-life-of-neva\\\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ec0cb32feb0bb156427186921a980e36f6c446b55162e151a1dc0fa47ec1cecf?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Miloslav Matou\\u0161ek\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/from-the-life-of-neva\\\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\\\/#webpage\",\"url\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/from-the-life-of-neva\\\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\\\/\",\"name\":\"The construction of the training centre is going according to the plan. | NEVA\",\"description\":\"The construction of the training centre is proceeding according to the plan. We have uncovered some important archaeological finds during the excavation work. You can read below how the first construction works went.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/from-the-life-of-neva\\\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/author\\\/matousek\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/author\\\/matousek\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.neva.eu\\\/wp-content\\\/uploads\\\/neva-nove-skolici-centrum.jpg\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/from-the-life-of-neva\\\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\\\/#mainImage\",\"width\":1920,\"height\":960},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/from-the-life-of-neva\\\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\\\/#mainImage\"},\"datePublished\":\"2020-06-01T09:28:48+02:00\",\"dateModified\":\"2020-07-10T07:02:50+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/\",\"name\":\"NEVA\",\"description\":\"Kvalita, kterou pozn\\u00e1te i po desetilet\\u00edch\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.neva.eu\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>The construction of the training centre is going according to the plan. | NEVA<\/title>\n\n","aioseo_head_json":{"title":"The construction of the training centre is going according to the plan. | NEVA","description":"The construction of the training centre is proceeding according to the plan. We have uncovered some important archaeological finds during the excavation work. You can read below how the first construction works went.","canonical_url":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":"&lt;meta name=\"facebook-domain-verification\" content=\"l52s6ngz14wm1hk29qnhhp9zt0uj98\" \/&gt;"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/#article","name":"The construction of the training centre is going according to the plan. | NEVA","headline":"NEVA builds: watch the first steps of training centre construction.","author":{"@id":"https:\/\/www.neva.eu\/en\/author\/matousek\/#author"},"publisher":{"@id":"https:\/\/www.neva.eu\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.neva.eu\/wp-content\/uploads\/neva-nove-skolici-centrum.jpg","width":1920,"height":960},"datePublished":"2020-06-01T09:28:48+02:00","dateModified":"2020-07-10T07:02:50+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/#webpage"},"isPartOf":{"@id":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/#webpage"},"articleSection":"From the life of NEVA, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.neva.eu\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.neva.eu\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.neva.eu\/en\/news\/category\/from-the-life-of-neva\/#listItem","name":"From the life of NEVA"}},{"@type":"ListItem","@id":"https:\/\/www.neva.eu\/en\/news\/category\/from-the-life-of-neva\/#listItem","position":2,"name":"From the life of NEVA","item":"https:\/\/www.neva.eu\/en\/news\/category\/from-the-life-of-neva\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/#listItem","name":"NEVA builds: watch the first steps of training centre construction."},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.neva.eu\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/#listItem","position":3,"name":"NEVA builds: watch the first steps of training centre construction.","previousItem":{"@type":"ListItem","@id":"https:\/\/www.neva.eu\/en\/news\/category\/from-the-life-of-neva\/#listItem","name":"From the life of NEVA"}}]},{"@type":"Organization","@id":"https:\/\/www.neva.eu\/en\/#organization","name":"NEVA","description":"Kvalita, kterou pozn\u00e1te i po desetilet\u00edch","url":"https:\/\/www.neva.eu\/en\/","telephone":"+420588003550","logo":{"@type":"ImageObject","url":"https:\/\/www.neva.eu\/wp-content\/uploads\/NEVA_logo_RGB.png","@id":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/#organizationLogo","width":135,"height":23},"image":{"@id":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/#organizationLogo"},"sameAs":["https:\/\/www.instagram.com\/neva.eu\/","https:\/\/www.youtube.com\/neva-eu","https:\/\/www.linkedin.com\/company\/neva-eu\/"]},{"@type":"Person","@id":"https:\/\/www.neva.eu\/en\/author\/matousek\/#author","url":"https:\/\/www.neva.eu\/en\/author\/matousek\/","name":"Miloslav Matou\u0161ek","image":{"@type":"ImageObject","@id":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/ec0cb32feb0bb156427186921a980e36f6c446b55162e151a1dc0fa47ec1cecf?s=96&d=mm&r=g","width":96,"height":96,"caption":"Miloslav Matou\u0161ek"}},{"@type":"WebPage","@id":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/#webpage","url":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/","name":"The construction of the training centre is going according to the plan. | NEVA","description":"The construction of the training centre is proceeding according to the plan. We have uncovered some important archaeological finds during the excavation work. You can read below how the first construction works went.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.neva.eu\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/#breadcrumblist"},"author":{"@id":"https:\/\/www.neva.eu\/en\/author\/matousek\/#author"},"creator":{"@id":"https:\/\/www.neva.eu\/en\/author\/matousek\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.neva.eu\/wp-content\/uploads\/neva-nove-skolici-centrum.jpg","@id":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/#mainImage","width":1920,"height":960},"primaryImageOfPage":{"@id":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/#mainImage"},"datePublished":"2020-06-01T09:28:48+02:00","dateModified":"2020-07-10T07:02:50+02:00"},{"@type":"WebSite","@id":"https:\/\/www.neva.eu\/en\/#website","url":"https:\/\/www.neva.eu\/en\/","name":"NEVA","description":"Kvalita, kterou pozn\u00e1te i po desetilet\u00edch","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.neva.eu\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"\u017daluzie NEVA | Kvalita, kterou pozn\u00e1te i po desetilet\u00edch","og:type":"article","og:title":"The construction of the training centre is going according to the plan. | NEVA","og:description":"The construction of the training centre is proceeding according to the plan. We have uncovered some important archaeological finds during the excavation work. You can read below how the first construction works went.","og:url":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/","og:image":"https:\/\/www.neva.eu\/wp-content\/uploads\/neva-nove-skolici-centrum.jpg","og:image:secure_url":"https:\/\/www.neva.eu\/wp-content\/uploads\/neva-nove-skolici-centrum.jpg","og:image:width":1920,"og:image:height":960,"article:published_time":"2020-06-01T07:28:48+00:00","article:modified_time":"2020-07-10T05:02:50+00:00","article:publisher":"https:\/\/www.facebook.com\/neva.eu","twitter:card":"summary_large_image","twitter:title":"The construction of the training centre is going according to the plan. | NEVA","twitter:description":"The construction of the training centre is proceeding according to the plan. We have uncovered some important archaeological finds during the excavation work. You can read below how the first construction works went.","twitter:image":"https:\/\/www.neva.eu\/wp-content\/uploads\/neva-nove-skolici-centrum.jpg"},"aioseo_meta_data":{"post_id":"9693","title":"The construction of the training centre is going according to the plan. | #site_title","description":"The construction of the training centre is proceeding according to the plan. We have uncovered some important archaeological finds during the excavation work. You can read below how the first construction works went.","keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[],"defaultGraph":"","defaultPostTypeGraph":""},"schema_type":null,"schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-22 10:21:53","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2021-01-11 08:46:57","updated":"2026-05-22 10:21:53","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.neva.eu\/en\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.neva.eu\/en\/news\/category\/from-the-life-of-neva\/\" title=\"From the life of NEVA\">From the life of NEVA<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tNEVA builds: watch the first steps of training centre construction.\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.neva.eu\/en\/"},{"label":"From the life of NEVA","link":"https:\/\/www.neva.eu\/en\/news\/category\/from-the-life-of-neva\/"},{"label":"NEVA builds: watch the first steps of training centre construction.","link":"https:\/\/www.neva.eu\/en\/from-the-life-of-neva\/neva-stavi-sledujte-prvni-kroky-vystavby-skoliciho-centra\/"}],"author_meta":{"display_name":"Miloslav Matou\u0161ek","author_link":"https:\/\/www.neva.eu\/en\/author\/matousek\/"},"featured_img":"https:\/\/www.neva.eu\/wp-content\/uploads\/neva-nove-skolici-centrum.jpg","coauthors":[],"tax_additional":{"categories":{"linked":["<a href=\"https:\/\/www.neva.eu\/en\/news\/category\/from-the-life-of-neva\/\" class=\"advgb-post-tax-term\">From the life of NEVA<\/a>"],"unlinked":["<span class=\"advgb-post-tax-term\">From the life of NEVA<\/span>"]}},"comment_count":"0","relative_dates":{"created":"Posted 6 years ago","modified":"Updated 6 years ago"},"absolute_dates":{"created":"Posted on 1. 6. 2020","modified":"Updated on 10. 7. 2020"},"absolute_dates_time":{"created":"Posted on 1. 6. 2020 9:28","modified":"Updated on 10. 7. 2020 7:02"},"featured_img_caption":"","series_order":"","_links":{"self":[{"href":"https:\/\/www.neva.eu\/en\/wp-json\/wp\/v2\/posts\/9693","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.neva.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.neva.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.neva.eu\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.neva.eu\/en\/wp-json\/wp\/v2\/comments?post=9693"}],"version-history":[{"count":0,"href":"https:\/\/www.neva.eu\/en\/wp-json\/wp\/v2\/posts\/9693\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.neva.eu\/en\/wp-json\/wp\/v2\/media\/8679"}],"wp:attachment":[{"href":"https:\/\/www.neva.eu\/en\/wp-json\/wp\/v2\/media?parent=9693"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.neva.eu\/en\/wp-json\/wp\/v2\/categories?post=9693"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.neva.eu\/en\/wp-json\/wp\/v2\/tags?post=9693"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}